In April 2024, the initial assembly and technical commissioning of the stage technology systems took place in the Gasometer Berlin. This deployment was crucial for the facility’s first operating license.
Key Areas of Deployment:
- Safety Equipment: Installation and electrical connection of safety edges on moving system parts.
- Test Preparation: Logistics and transport of test weights for load tests.
- Acceptance Support: Supporting the experts (SV) during the inspection and accompanying the subsequent TÜV acceptance after initial commissioning.
- Commissioning: Active participation in the adjustment and first startup of the systems under real conditions.
The image shows several tons of test weights that have to be distributed accordingly on the podiums for the TÜV inspection.